summaryrefslogtreecommitdiff
path: root/doc/development/documentation/improvement-workflow.md
diff options
context:
space:
mode:
authorAchilleas Pipinellis <axil@gitlab.com>2019-08-20 20:22:43 +0200
committerAchilleas Pipinellis <axil@gitlab.com>2019-08-20 20:22:43 +0200
commite61308ce1d82e12e5087371469baea4a452875d1 (patch)
tree62551a3ae4eab75e5af7e3b35358c07a51b2132f /doc/development/documentation/improvement-workflow.md
parent4f323bb62fbe71a4352de25cab141f361a3fe1a6 (diff)
parent2989ed078c1d45b0959dcecb1bc3c8f4740a3c0d (diff)
downloadgitlab-ce-docs-patch-71.tar.gz
Merge branch 'master' into docs-patch-71docs-patch-71
Diffstat (limited to 'doc/development/documentation/improvement-workflow.md')
-rw-r--r--doc/development/documentation/improvement-workflow.md6
1 files changed, 3 insertions, 3 deletions
diff --git a/doc/development/documentation/improvement-workflow.md b/doc/development/documentation/improvement-workflow.md
index a12c3d5ea7b..80fbd4b6427 100644
--- a/doc/development/documentation/improvement-workflow.md
+++ b/doc/development/documentation/improvement-workflow.md
@@ -52,9 +52,9 @@ To request a post-merge review, [create an issue for one using the Doc Review te
**3. Maintainer**
1. Review by assigned maintainer, who can always request/require the above reviews. Maintainer review can occur before or after a technical writer review.
-2. Ensure a release milestone of the format XX.Y is set. If the freeze for that release has begun, add the label `pick into <XX.Y>` unless this change is not required for the release. In that case, simply change the milestone.
-3. If EE and CE MRs exist, merge the EE MR first, then the CE MR.
-4. After merging, if there has not been a technical writer review and an issue for a follow-up review was not already created and linked from the MR, [create the issue using the Doc Review template](https://gitlab.com/gitlab-org/gitlab-ce/issues/new?issuable_template=Doc%20Review) and link it from the MR.
+1. Ensure a release milestone of the format XX.Y is set. If the freeze for that release has begun, add the label `pick into <XX.Y>` unless this change is not required for the release. In that case, simply change the milestone.
+1. If EE and CE MRs exist, merge the EE MR first, then the CE MR.
+1. After merging, if there has not been a technical writer review and an issue for a follow-up review was not already created and linked from the MR, [create the issue using the Doc Review template](https://gitlab.com/gitlab-org/gitlab-ce/issues/new?issuable_template=Doc%20Review) and link it from the MR.
## Other ways to help